Elementary School Projects
A-F
- Aloha-Huber Park K-8
- Barnes
- Beaver Acres
- Bethany
- Bonny Slope
- Cedar Mill
- Chehalem
- Cooper Mountain
- Elmonica
- Errol Hassell
- Findley
- Fir Grove
Aloha-Huber Park K-8
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Roof Repair
Application of spray-on membrane to entire roof.
Budget: $650,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
Other 2014 Bond Projects
Building doors and hardware upgrades; replace the boiler; replace manual backboard hoists with electric hoists.
Upcoming 2014 Bond Projects
Fire system upgrades.
Barnes
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
HVAC & Roof Repair
Replacement of unit ventilators in five classrooms. Tear off of old section and re-roof.
Budget: $1,088,000
Funding: 2014 Bond
Schedule: 06/2020 - 09/2020
Other 2014 Bond Projects
Building doors and hardware upgrades; replace exterior wood-framed windows with aluminum frames; replace manual backboard hoists with electric hoists.
Beaver Acres
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
School Kitchen Improvements
Visit the project page for more information.
Seismic Upgrades
Visit the project page for more information. Roofing, new water pipes, and new exterior windows were added to the scope of the seismic project at this school.
Other 2014 Bond Projects
Building doors and hardware upgrades; replace rooftop units; replace kitchen dishwasher.
Bethany
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Kindergarten Playground Repairs
Replace kindergarten playground.
Final Cost: $89,470
Funding: Construction Excise Tax
Schedule: 12/2017 - 03/2018
Repipe
Replace domestic water lines throughout the building; replace hot water heaters and structural infill under slab.
Final Cost: $1,079,000
Funding: 2014 Bond
Schedule: 06/2018 - 08/2018
School Kitchen Improvements
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; parking lot slurry seal and repaving; covered play area re-paved; replace manual backboard hoists with electric hoists; replace carpet and rubber cove base in portable.
Upcoming 2014 Bond Projects
Roofing; HVAC.
Bonny Slope
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades.
Cedar Mill
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Electrical Upgrades
Install new 3-phase electrical service, switchgear and electrical panels.
Budget: $489,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
HVAC System Upgrade
Install new HVAC systems throughout main building.
Budget: $2,500,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
New Playground Structures
Retrofit and replace playground components.
Final Cost: $31,600
Funding: 2014 Bond
Schedule: 04/2015 - 08/2015
Roofing
Install new roofing on main building.
Budget: $953,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
School Kitchen Improvements
Visit the project page for more information.
Seismic Upgrades
Visit the project page for more information. Seismic work at this school was included in the roofing and HVAC projects.
Other 2014 Bond Projects
Building doors and hardware upgrades.
Upcoming 2014 Bond Projects
New exterior windows; new emergency generator.
Chehalem
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Playground Structures
Replace playground structure, swings and refurbish surfacing.
Final Cost: $114,100
Funding: 2014 Bond
Schedule: 06/2018 - 08/2018
Other 2014 Bond Projects
Building doors and hardware upgrades; HVAC controls upgrade; replace failing clock system; replace existing manual backboard hoists with electric hoists; renovate seclusion room.
Upcoming 2014 Bond Projects
Paving of parking lot; new emergency generator.
Cooper Mountain
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Seismic Upgrades
Visit the project page for more information. Seismic work at this school will be included in the upcoming roofing project.
Other 2014 Bond Projects
Building doors and hardware upgrades; HVAC controls upgrades.
Upcoming 2014 Bond Projects
Roofing.
Elmonica
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
2018 Portable Moves
Move to Elmonica ES from Five Oaks MS.
Final Cost: $260,680
Funding: Construction Excise Tax
Schedule: 2018
Rooftop Unit Replacement
Replace rooftop HVAC units on the A wing.
Final Cost: $187,300
Funding: 2014 Bond
Schedule: 06/2018 - 10/2018
School Kitchen Improvements
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; HVAC controls upgrade; replace boiler system; remove trees in bus lane obstructing field of view.
Upcoming 2014 Bond Projects
Roofing.
Errol Hassell
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Restroom Remodel
Remodel of student restrooms.
Budget: $856,000
Funding: 2014 Bond
Schedule: 06/2020 - 09/2020
Other 2014 Bond Projects
Building doors and hardware upgrades; replace boiler system; replace failing clock system; repair damaged paving and re-stripe; replace damaged flooring in portable restrooms.
Upcoming 2014 Bond Projects
Building intercom system replacement; roofing.
Findley
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Playground Refurbishment
Replace specific components of playground structure with new equipment and replenish engineered wood fiber.
Budget: $46,000
Funding: 2014 Bond
Schedule: Summer 2019
Other 2014 Bond Projects
Building doors and hardware upgrades; replace failing VCT gym floor with rubber Mondo floor; replace damaged restroom partitions with new partitions; various repairs to portables.
Upcoming 2014 Bond Projects
Roofing.
Fir Grove
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Drainage Repairs
Repair drainage around playground structures.
Final Cost: $148,500
Funding: Construction Excise Tax
Schedule: 06/2016 - 09/2016
Replace Playground Structures
Retrofit and/or replace damaged components to meet compliance.
Final Cost: $52,000
Funding: 2014 Bond
Schedule: 06/2016 - 09/2016
Other 2014 Bond Projects
Building doors and hardware upgrades; replace stage rigging; replace carpet in portables one and two; replace failing clock system; parking lot asphalt repairs.
Upcoming 2014 Bond Projects
Electrical upgrades; new emergency generator; roofing.
G-O
Greenway
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Drainage Repairs
Repair drainage around playground structures.
Final Cost: $332,900
Funding: Construction Excise Tax
Schedule: 06/2016 - 11/2016
Replace Playground Structures
Retrofit and/or replace damaged components to meet compliance.
Final Cost: $74,700
Funding: 2014 Bond
Schedule: 06/2016 - 11/2016
Other 2014 Bond Projects
Building doors and hardware upgrades; replace stage curtains; replace boiler system; replace failing clock system; renovate seclusion room.
Upcoming 2014 Bond Projects
Roofing.
Hazeldale
Building Replacement
Visit the project page for more information.
Hiteon
Chiller Replacement
Replace chiller and associated systems.
Final Cost: $186,400
Funding: 2014 Bond
Schedule: 06/2018 - 03/2019
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Playground Structures
Refurbish playground.
Final Cost: $359,500
Funding: 2014 Bond
Schedule: 06/2017 - 10/2017
Other 2014 Bond Projects
Building doors and hardware upgrades; replace manual backboard hoists with electric hoists.
Upcoming 2014 Bond Projects
HVAC controls; intercom system improvements; roofing.
Jacob Wismer
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Fire Alarm System Upgrades
Remove and replace all devices, fire alarm panel and power supplies.
Final Cost: $196,000
Funding: 2014 Bond
Schedule: 06/2015 - 08/2015
School Kitchen Improvements
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; gym roof truss repair.
Upcoming 2014 Bond Projects
Roofing.
Kinnaman
Chiller Replacement
Replace chiller and associated systems.
Final Cost: $186,400
Funding: 2014 Bond
Schedule: 06/2018 - 03/2019
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Rooftop Heat Pump Replacement
Replace HVAC units on the B wing.
Final Cost: $68,600
Funding: 2014 Bond
Schedule: 09/2017 - 11/2017
Other 2014 Bond Projects
Building doors and hardware upgrades; renovate seclusion room; replace portable wood decking with aluminum decking.
Upcoming 2014 Bond Projects
Replace playground structures; HVAC.
McKay
ADA Upgrades
Visit the project page for more information.
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; renovate staff restrooms and repair plumbing issues.
Upcoming 2014 Bond Projects
Building intercom and clock system replacement; playground; new exterior windows; remodel restrooms; roofing.
McKinley
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Playground Structures
Replace playground structure and refurbish surfacing.
Final Cost: $94,000
Funding: 2014 Bond
Schedule: 07/2017 - 09/2017
Other 2014 Bond Projects
Building doors and hardware upgrades; repair/replace student restroom partitions; replace damaged flooring in portable restrooms; replace damaged asphalt pathway.
Upcoming 2014 Bond Projects
HVAC; roofing; new emergency generator.
Montclair
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Playground Structures
Replace playground structures and refurbish surfacing.
Final Cost: $52,500
Funding: 2014 Bond
Schedule: 07/2018 - 10/2018
2014 Portable Moves
Move to Montclair ES from Sunset HS.
Final Cost: $145,000
Funding: 2014 Bond
Schedule: 2014
Other 2014 Bond Projects
Building doors and hardware upgrades; replace carpet and rubber cove base in ten classrooms; replace failing clock system; replace existing manual backboard hoists with electric hoists.
Upcoming 2014 Bond Projects
Electrical upgrades; new emergency generator; new exterior windows; roofing.
Nancy Ryles
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Playground Refurbishment
Replace specific components of playground structure with new equipment and replenish engineered wood fiber.
Final Cost: $97,000
Funding: 2014 Bond
Schedule: 06/2020 - 09/2020
Other 2014 Bond Projects
Building doors and hardware upgrades.
Upcoming 2014 Bond Projects
Fire system upgrades; HVAC; roofing; new kitchen dishwasher.
Oak Hills
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Playground Structures
Replace playground structure and add drainage in playground area.
Final Cost: $148,900
Funding: 2014 Bond
Schedule: 07/2017 - 09/2017
New Kitchen Freezer
Replace kitchen freezer and update components.
Final Cost: $148,300
Funding: 2014 Bond
Schedule: 07/2017 - 09/2018
Other 2014 Bond Projects
Building doors and hardware upgrades.
Upcoming 2014 Bond Projects
Student and staff restroom remodel; electrical system upgrades; new emergency generator.
P-Z
- Raleigh Hills K-8
- Raleigh Park
- Ridgewood
- Rock Creek
- Sato
- Scholls Heights
- Sexton Mountain
- Springville K-8
- Terra Linda
- Vose
- West Tualatin View
- William Walker
Raleigh Hills K-8
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Raleigh Hills K-8 Improvements
Visit the project page for more information.
School Kitchen Improvements
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; install acoustic panels in gym; sewer repair; siding replacement.
Raleigh Park
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
HVAC & Electrical Upgrades
Full heating/ventilation system replacement and electrical upgrades.
Budget: $2,420,000
Funding: 2014 Bond
Schedule: 06/2020 - 09/2020
New Playground Structures
Replace and refurbish play structures.
Final Cost: $140,700
Funding: 2014 Bond
Schedule: 07/2018 - 09/2018
School Kitchen Improvements
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; replace stage curtains; replace areas of hallways and failing gym floor with new flooring.
Upcoming 2014 Bond Projects
Replace sewer line; new emergency generator.
Ridgewood
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Electrical Upgrades
Install new 3-phase electrical service, switchgear and electrical panels.
Budget: $1,195,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
HVAC System Upgrade
Install new HVAC systems throughout main building.
Budget: $3,365,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
New Playground Structures
Retrofit, replace structures, refurbish surfacing and add drainage.
Final Cost: $59,100
Funding: 2014 Bond
Schedule: 07/2016 - 09/2017
Parking Lot Repair & Slurry Seal, Resurface Track
Repave rear bus loop and resurface track.
Final Cost: $136,700
Funding: 2014 Bond
Schedule: 08/2016 - 10/2017
Freezer Replacement
Visit the School Kitchen Improvements project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; boiler replacement.
Rock Creek
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Drainage Repairs
Repair drainage around playground structures.
Final Cost: $174,700
Funding: Construction Excise Tax
Schedule: 06/2016 - 08/2016
Gym & Hallway Floor Replacement
Replacement of old flooring.
Budget: $136,000
Funding: 2014 Bond
Schedule: 06/2020 - 09/2020
New Kitchen Freezer
Replace kitchen freezer and update components.
Final Cost: $300,000
Funding: 2014 Bond
Schedule: Summer 2021
Playground Replacement
Remove and replace all playground equipment.
Final Cost: $205,400
Funding: 2014 Bond
Schedule: 06/2016 - 08/2016
Other 2014 Bond Projects
Building doors and hardware upgrades; portable carpet replacement; remodel restrooms in main building for ADA compliance and new fixtures.
Upcoming 2014 Bond Projects
New emergency generator.
Sato
New Building
Visit the project page for more information.
Scholls Heights
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Playground Refurbishment
Replace specific components of playground structure with new equipment and replenish engineered wood fiber.
Budget: $20,000
Funding: 2014 Bond
Schedule: Summer 2019
Other 2014 Bond Projects
Building doors and hardware upgrades; renovate seclusion room.
Upcoming 2014 Bond Projects
Intercom system improvements.
Sexton Mountain
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Fire Alarm Detectors
Remove and replace all devices, fire alarm panel and power supplies to bring system up to code requirements.
Final Cost: $286,000
Funding: 2014 Bond
Schedule: 06/2015 - 08/2015
Roof Replacement
Replace standing seam metal roofing over the library, gym and cafeteria.
Final Cost: $935,700
Funding: 2014 Bond
Schedule: 06/2018 - 09/2018
Other 2014 Bond Projects
Building doors and hardware upgrades.
Upcoming 2014 Bond Projects
New emergency generator.
Springville K-8
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Springville K-8 Improvements
Visit the project page for more information.
2014 Portable Moves
Move to Springville ES from Sunset HS.
Final Cost: $134,100
Funding: 2014 Bond
Schedule: 2014
2015 Portable Moves
Move to Springville ES from Hazeldale ES.
Final Cost: $152,600
Funding: 2014 Bond
Schedule: 2015
Other 2014 Bond Projects
Building doors and hardware upgrades; replace boiler.
Terra Linda
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
Repipe & Restroom Remodel
Replace domestic water piping throughout the school and complete remodel of restrooms for ADA compliance including new fixtures and finishes.
Budget: $1,736,000
Funding: 2014 Bond
Schedule: 06/2020 - 09/2020
School Kitchen Improvements
Visit the project page for more information.
Other 2014 Bond Projects
Building doors and hardware upgrades; replace damaged asphalt sidewalk; replace existing manual backboard hoists with electric hoists.
Upcoming 2014 Bond Projects
Playground; HVAC.
Vose
Building Replacement
Visit the project page for more information.
West Tualatin View
District-Wide Interior Classroom Locks
Visit the project page for more information.
District-Wide Security Upgrades
Visit the project page for more information.
District-Wide Unified Communication System
Visit the project page for more information.
New Playground Structures
Replace worn structure and construct ADA access.
Final Cost: $150,400
Funding: 2014 Bond
Schedule: 07/2016 - 09/2016
Roof Replacement
Full tear-off re-roof of school.
Budget: $1,400,000
Funding: 2014 Bond
Schedule: 06/2019 - 09/2019
Other 2014 Bond Projects
Building doors and hardware upgrades; reconstruct damaged wood flooring and walls in portable.
Upcoming 2014 Bond Projects
Replace exterior windows; new sewer pipes; paving.
William Walker
Building Replacement
Visit the project page for more information.
MAJOR ELEMENTARY SCHOOL
2014 BOND PROJECTS
MAJOR DISTRICT-WIDE
2014 BOND PROJECTS